Original design by Ed Bargy 1985
Track Upgrade & Lengthening designed in 1995 by Ed Bargy
Retrofit/ Upgrade, Due to Highway 21 Widening designed By Ed Bargy in 2002
Designed by Ed Bargy in 2003 to improve safety of turn # 5
designed by Ed Bargy in 2008
By Ed Bargy
Designed by Ed Bargy in 2007
with retaining walls, crew signaling area and concrete refueling pad.
with offices & garages below designed by Ed Bargy 2015
on pit road with offices & garages below designed by Ed Bargy 2015
with top level for auto racing & lower level for M/C Roadracing, designed by Ed Bargy